Tavantolgoi-Zuunbayan railway construction goes smoothly
Ulaanbaatar /MONTSAME/. Last weekend, President of Mongolia Kh.Battulga worked in Dornogobi to get acquainted with the development works of Tavantolgoi-Zuunbayarn railroad, being built in Mandakh soum of the aimag. As reflected in a document “State Policy on Railway”, a 414.6 km long road from Tavantolgoi coal mine in Tsogttsegtsii soum of Umnugobi aimag to Zuunbayan, Dornogobi aimag is presently under construction.
2183 days